Datim were appointed on a design and build basis to undertake the refurbishment of the top floor office space at Eldon Court Newcastle to create new space for the Newcastle Chronicle Office
Scope of Works / The Project
The project had to be completed in a very tight timescale with the completion fixed so the incoming tenant could work seamlessly on their media output. The added difficulty of working in a town centre location in the top floor of an occupied office block also had to be considered.
Starting with a fixed end date Datim undertook the completion of the outline design and commenced on site for a 16wk build period worth in excess of £1.2mill the works comprised of the following
- Full design works including M&E design
- Strip out the existing fixtures and fitting
- Plumbing, Mechanical. HVAC works
- New incoming infrastructure
- New partitioning works
- Decoration
- Flooring
This very challenging project cam in under the original budget and ahead of the clients required schedule thus enabling them to move office space within the allocated time schedules.